Fiber Cement Board Partition Wall Installation Guide

Fiber Cement Board Partition Wall Installation Guide

1. Preparation

Tools Required

  • Cutting: Handsaw, circular saw
  • Drilling: Power drill
  • Edging: Planer/grinder
  • Fastening: Screw gun, nail gun

Materials Needed

  • Fasteners: Self-drilling screws (4×25mm)
  • Sealants: Joint tape, caulk
  • Accessories: Metal corner beads

2. Installation Steps

Board Preparation

  • Cutting: Use fine-tooth blades for clean edges
  • Drilling: Back with wood block for cleaner holes
  • Edging: Smooth edges with planer
Fiber Cement Board Partition Wall Installation Guide

Framing Tips

  • Single-layer: Stagger all joints
  • Double-layer: Offset second layer seams
  • Soundproofing: Use double stud framing

3. Professional Techniques

Installation Methods

  • Steel studs: Use self-tapping screws
  • Wood studs: Use ring-shank nails
  • Pro tip: Keep fasteners 10-16mm from edges

Seam Treatment

  1. Leave 3mm expansion gap
  2. Apply sealant first
  3. Press boards for even distribution

4. Important Notes

  • Fire-rated walls: Must install vertically
  • Pipe openings: Max 2580mm² per cavity
  • Decoration: Paint or wallpaper directly

Our technical staff is available 24/7 for support and fast response, giving full advice on your products and sharing engineering knowledge. Whether you order or not, we’re always here to support your business.

This field is required.
This field is required.
This field is required.